Al-Sweideiah Oil Field Development Project

Syria

The project was to carry-out the detailed engineering design a GOSP facility at a capacity of 60,000 m3 per day, the facilities compromised of three gas/oil separation trains, three gas/oil transportation stations, three gas U/G pipelines, three oil U/G pipelines and oil field water injection system. The project scope was to carry out the detailed engineering designs and deliver all relevant engineering documents and drawings for a Tender Documents package.
The design included:

o Process engineering including hydraulic modelling
o Piping design and Stress analysis
o Static Equipment (Separators, tanks, etc.)
o Rotary Equipment (Dispatch Pumps, water injection pumps
o Instrumentation and control
o R.C. Foundations and Steel structure platforms
o Utilities (plant water supply, industrial drainage, compressed air)
o Fire Protection systems

Client Name

SPC (Syrian Petroleum Company)

Project Size

Confidential